Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Dec 16, 2021     Elevator attach bolt inspection windows - (1 hour)       Category: Fuselage
I only had a short time available today, so I began making inspection windows in the two aft cover plates (under the horizontal stabilizers). This will allow me to visually inspect the elevator pushrod attach point on every preflight -- with a flashlight, instead of having to remove a bunch of screws. I will cut some plexiglas for the actual viewing windows.

I marked the two plates for 2-9/16" holes, drilled out the centers with a unibit, and used a nibbler and a file to get the first of the two holes up to full-size.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.